IT三字經

一些縮寫詞彙,趕時髦,慢慢更新,一個加一個
CRM(Client Relationship  Management)
SCM(Supply Chain Management)
PLM(Product Lifecycle Management)
SRM(Supplier Relationship Management)
ERP(Enterprise Resource Planning)
MRP(Material Require Planning)
MIS(Management Information System)
FMS(Flexible Manufacture System)
FQC(Finish or Final Quality Control)
EIS(Executive Information System)
DSS(Decision Support System)
DRP(Distribution Resource Planning)
DMT(Design Maturing Testing)
BPR(Business Process Reengineering)
SE    Software Engineering
BURS    Business and User Requirement Specification
CCB    Change Control Board
CI    Configuration Item
CR    Change Request
CMM    Capability Maturity  Model
COQ    Cost Of Quality
CUT    Coding&Unit Test /Construct
DD    Detail Design
DP    Defect Prevention ( CMM Level 5 KPA )
FURPS+    Functionality, Usability, Reliability, Performance,Supportability, + Localizability, Portability
HLD    High Level Design
IC (IGC)    Intergroup Coordination ( CMM Level 3 KPA )
ISM    Integrated Software Management ( CMM Level 3 KPA )
IT    Integration Test
KPA    Key Process Area
LC    Lifecycle
LLD    Low Level Design
OOA    Object Oriented Analysis
OOD    Object Oriented Design
OPD    Organization Process Definition ( CMM Level 3 KPA )
OPF    Organization Process Focus ( CMM Level 3 KPA )
OSSP    Organization Standard Software Process
PCB    Process Capability  Baselines
PCM    Process Change  Management ( CMM Level 5 KPA )
PDSP    Project's Defined  Software Process
PI    Process Improvement
PMR    Project Management Review
PM    Project Manager
PP    Project Planning
PR    Peer Reviews ( CMM Level 3 KPA)
QC    Quality Champion
QP    Quality Plan
QPM    Quantitative Process  Management  ( CMM Level 4 KPA )
RA    Requirement Analysis
RCA    Root Cause Analysis
RFP    Request for Proposal
RM    Requirements  Management  ( CMM Level 2 KPA )
ROI    Return On Investment
SCCB    Software Configuration Control Board
SCM    Software Configuration Management ( CMM Level 2 KPA)
SCMP    Software Configuration Management Plan
SDLC    Software Development Life Cycle
SEI    Software Engineering Institute
SEPG    Software Engineering  Process Group
SD    System Design
SMR    Senior Management  Review
SPC    Statistical Process Control
SPE    Software Product Engineering ( CMM Level 3 KPA )
SPI    Software Process  Improvement
SPP    Software Project Plan ( CMM Level 2 KPA )
SPTO    Software Project Tracking & Oversight
SQA    Software Quality  Assurance  ( CMM Level 2 KPA )
SQM    Software Quality Management
SRS    System/Software Requirement Specification
SSD    System Sequence Diagram
SSM    Software Subcontract Management  ( CMM Level 2 KPA )
TCM    Technology Change Management
TP    Training Plan / Training Program  ( CMM Level 3 KPA )
TQM    Total Quality Management
UAT    User Acceptance Test
UC    Use Case
UCD    Use Case Diagram
UT    Unit Testing
WBS    Work Breakdown Structure
發表評論
所有評論
還沒有人評論,想成為第一個評論的人麼? 請在上方評論欄輸入並且點擊發布.
相關文章