CBO估計執行計劃需要參考的三項

Estimator

The estimator determines the overall cost of a given execution plan. The estimator generates three different types of measures to achieve this goal:

  • Selectivity

    This measure represents a fraction of rows from a row set. The selectivity is tied to a query predicate, such as last_name='Smith', or a combination of predicates.

  • Cardinality

    This measure represents the number of rows in a row set.

  • Cost

    This measure represents units of work or resource used. The query optimizer uses disk I/O, CPU usage, and memory usage as units of work.

If statistics are available, then the estimator uses them to compute the measures. The statistics improve the degree of accuracy of the measures.


最重要的就是上面三個方面:

1.選擇度

2.基數

3.成本

發表評論
所有評論
還沒有人評論,想成為第一個評論的人麼? 請在上方評論欄輸入並且點擊發布.
相關文章